Memorial Day 2027 lands on May 31, and it feels far away at this time of year. But the calendar is tighter than most homeowners expect, and Arista Pool & Spa is currently scheduling new projects for a June or July start. Building the pool is only one part of the schedule, and the steps before construction take real time. Here is how to work backward from that start time to the day you want to be in the water.
Start at the Finish Line and Count Backward
The easiest way to plan a pool is to begin with the date you want to swim and subtract each stage of the project.
Your First Swim
Your pool needs to be filled, balanced, and ready before the first swim, which means construction must be finished with room to spare for startup and water chemistry.
Construction: About 6 to 8 Weeks
Arista’s typical construction time is approximately 6 to 8 weeks after planning and approvals. Weather, soil conditions, and the features you choose can move that number, so it helps to build in a cushion. Arista is currently scheduling new projects for a June or July start, so that is the window to plan around.
Inspections Along the Way
Pool construction involves inspections at key stages, and each one has to be scheduled and passed before work moves forward. A smooth build leaves room for them instead of treating them as an afterthought.
Permits and Approvals Before That
Before anyone can dig, your township generally needs to review and approve the plans. Review times vary from place to place and can take weeks or even months. This is the stage that surprises homeowners most, because it cannot be rushed from the builder’s side.
Materials and Scheduling
Tile, coping, equipment, and finishes have to be selected and ordered, and your project needs a place on the construction calendar. Because new projects are being scheduled for a June or July start, it helps to secure your place on the calendar early.
Design and Consultations First
Permit applications need a finished plan. That means the shape, depth, location, features, and layout all have to be decided first. Good design is not a rushed weekend decision, and it works best with time for revisions.
What Waiting Until Spring Really Means
If the first design conversation happens in April, everything above still has to happen in order. Design, permits, materials, and scheduling can easily consume the spring, which can push your start later in the season than you hoped. The pool is not any less beautiful when it opens late in the summer, but you will have missed the weeks you were hoping to enjoy.
A Sample Timeline Working Back From a June or July Start
- Late fall: Free estimate and first design consultation.
- Winter: Finalize the design and choose tile, coping, decking, lighting, and features.
- Late winter: Submit permit plans and secure your spot on the construction schedule.
- June or July: Construction begins.
- The weeks that follow: Final inspections, plaster, fill, and startup.
- Startup complete: Your first swim.
Treat this as a framework, not a promise. Every property and township is different, and the right schedule for your yard comes from a conversation about your specific project.
Why Gunite Takes Planning, and Why It Is Worth It
Arista Pool & Spa only builds gunite pools. We build them because they are the most durable, most customizable, and longest-lasting type of pool. Gunite is formed on site over a steel framework, so every pool is designed around your property. That level of customization is exactly why the design phase deserves real time. You can see how the build works in our gunite pool construction process.
Ways to Use the Winter Well
Winter is a productive season for pool planning. You can visit our showroom to see materials in person, review 3-D renderings of your backyard, compare features, and make decisions without feeling rushed. By the time spring arrives, your plan is ready to go.
Close to Home in Chester, Montgomery, and Bucks Counties
Arista has more than 20 years of experience building pools for homeowners across Chester, Montgomery, and Bucks Counties, and our team knows what local townships look for. We offer free estimates and are happy to walk through a realistic timeline for your project.
Start the Clock Today
If you want to be swimming next summer, the best time to begin is now. Contact Us today to schedule your time or to visit our state-of-the-art showroom, and let us help you work backward to the date that matters most.