Common Question: How Long Does It Take to Build a Pool?

If you’ve been dreaming of transforming your backyard into a private oasis, one of the first questions you probably have is: “How long does it take to build a pool?” It’s one of the most common questions we get at Arista Pool & Spa and it’s a good one.

The honest answer is: it depends. Every pool we build is custom, which means timelines vary depending on factors like size, complexity, materials, weather, and township permitting. But the good news is that Arista Pool & Spa builds most pools in just 6 to 8 weeks, which is significantly faster than many of our competitors.

That 6 to 8 weeks is the construction window, from the time we break ground to the time we’re brushing off the last bit of dust and giving you the go-ahead to dive in. That’s an incredibly efficient timeline when you consider the amount of craftsmanship, engineering, and precision involved in building a high-end custom inground gunite pool.

Design and Permits Take Time So Don’t Wait

While the actual pool construction takes about 6 to 8 weeks, there’s important prep work that comes before we ever start digging. Designing your custom pool, finalizing features, preparing construction plans, and most importantly, getting permits from your township, can all take additional time. Every township is different, and the permit approval process can range from a few weeks to a few months depending on zoning requirements, property conditions, and workload at the municipal level.

That’s why, if you’re hoping to be swimming by summer of 2026, you should start the process now.

The sooner we begin designing your pool and submitting paperwork, the sooner we can line up construction for early spring 2026. That gives us time to complete your custom pool and all finishing touches by the time warm weather hits and your friends and family will be splashing around in your backyard by June.

Arista Pool & Spa: Faster, Smarter, and Smoother

We pride ourselves on not only delivering stunning custom pools, but also delivering them on time and with fewer delays. With over 20 years of experience building high-end pools in Chester County, Bucks County, and Montgomery County, we know the ins and outs of local codes, permitting offices, and how to streamline the process. That’s why we consistently finish faster than most pool companies in the area.

Our in-house team coordinates directly with your township to make sure nothing gets overlooked. We also maintain strong relationships with quality subcontractors and suppliers, helping us stay on schedule and avoid the hiccups that slow other builders down.

And while speed is important, it never comes at the expense of craftsmanship. We build luxury gunite pools designed to last for decades and we do it with precision, attention to detail, and a strong focus on customer communication throughout every phase.

A Pool Tailored to You

When we say custom, we mean it. From the initial design consultation to the final touches, your pool will be designed specifically for your backyard, your vision, and your lifestyle. That includes layout, materials, finishes, water features, lighting, and even surrounding hardscaping.

The more complex and customized your design, the more planning it requires but that’s why we encourage you to get started now. The sooner you begin working with us, the more time we have to bring your perfect backyard vision to life without having to rush through important decisions.

Let’s Get Started Today

If you’ve been thinking about finally building that dream pool, there’s no better time than now to get the process underway. The clock may be ticking toward next summer, but with the right builder and an efficient plan, your backyard could be swim-ready by Summer 2026.

Contact Arista Pool & Spa today to schedule your free estimate or stop by our showroom. We’ll walk you through the entire process, answer your questions, and help you begin your journey toward the perfect pool on a timeline that gets you swimming sooner, not later.